FODS Getfods Highway Construction Site Entrance Construction Site Exit Exit Grid FODS Trackout Control System FODS Mats

Industries

Heavy Civil

Advantages of FODS in Heavy Civil Projects

The FODS Trackout Control System has become the industry standard with leading general contractors for construction entrances on highway, bridge, and heavy civil projects. Designed to stop trackout at the source, FODS offers a modern, rockless alternative to traditional stabilized construction entrances.

Engineered for performance, efficiency, and compliance, the FODS Reusable Construction Entrance delivers unmatched advantages for contractors, project owners, and regulatory agencies alike. Its real world tested and proven durability, cost-effectiveness, labor reduction and ease of deployment make it an ideal solution for a broad range of civil infrastructure projects.

 

Key Advantages

•   Smart ROI & Long-Term Value FODS mats deliver a lower total cost of ownership compared to rock entrances. Their reusability, extended service life, and elimination of recurring rock replacement expenses result in a clear return on investment.

•   Stable & Anchored Platform Provides a safe, secure, anchored, and construction exit that withstands heavy civil construction equipment while maintaining stability and effectiveness.

•   Rapid Deployment & Reuse Installation takes less than 30 minutes. FODS can be easily moved, removed, relocated, and reused multiple times across different project phases or sites.

•   Risk Management & Compliance Support Reduces the liability that  contractors and project owners experience with ineffective entrances by minimizing trackout, meeting BMP standards, and supporting SWPPP compliance.

•   Trackout & Sediment Control Helps prevent mud and debris from leaving construction zones, while also reducing fugitive dust, sediment migration, and stormwater pollution.

•   Versatile Application Can be anchored to virtually any substrate—including directly to dirt substrates, concrete, asphalt, and pavement—making it suitable for diverse environments and conditions.

•   Proven Longevity Constructed for more than ten years of continuous use, delivering consistent performance throughout the life of multiple projects.

 

Why FODS Works for Heavy Civil Projects

Highway, bridge, water supply, and other infrastructure construction sites present unique challenges in managing sediment and debris. Traditional rock entrances demand constant maintenance, frequent rock refresh or replacement, and additional disposal costs. FODS eliminates these inefficiencies while improving environmental compliance and site safety.

By replacing rock with a durable, engineered solution, FODS helps heavy civil contractors reduce operating costs, control labor cost, accelerate project timelines, and improve regulatory outcomes.


Advantages Of FODS In Heavy Civil Projects

FODS Trackout Control System is fast becoming the new industry standard construction entrance when it comes to STOPPING highway, bridge & heavy civil construction site TRACKOUT.

The FODS Reusable Rockless Construction Entrance provides many advantages and benefits as a replacement to traditional stabilized construction rock entrances. These benefits make FODS an excellent fit for use on a wide range of highway, bridge & heavy civil development projects, environments, and customers.

A smart ROI, low long term cost, and meets minimum entrance width requirements

Provides an anchored compact stable exit/entrance for construction traffic

Easily and rapidly installed in under 30 minutes, moved, removed, relocated and reused

Alleviates risk management associated with construction entrances

Helps prevent tracking of mud onto roadways, reduces fugitive dust, sediment erosion and storm water runoff

Is versatile and be anchored to any substrate including concrete, pavement, asphalt, etc.

Longevity: Designed for over ten years of use.

Denver's Globeville Neighborhood Construction Library Housing FODS on site
tcm
Heavy Civil

Keeping Construction Moving in Denver’s Globeville

On a mixed-use development site in Denver’s Globeville neighborhood, ongoing construction activity and frequent truck traffic required effective management of sediment at the site entrance. FODS was implemented to support consistent trackout control throughout the project.

Read More

tcm
FODS In The Field
Heavy Civil

Demeter Millwork Manufacturing Facility Expansion

Demeter Millwork is constructing a new 53,000-square-foot manufacturing facility in Woodridge, Illinois, to expand production of architectural millwork and custom interior fabrication. The state-of-the-art plant will increase manufacturing capacity while supporting jobs and industrial growth in the region.

Read More

tcm
FODS In The Field
Heavy Civil

Trackout Control at the Maizuru–Wakasa Nojiri Tunnel Project

FODS Japan - Trackout Control Mats Implemented in the Maizuru-Wakasa Expressway Nojiri Tunnel Project

Read More

tcm
FODS In The Field
Heavy Civil

Sustainable Construction at the Palisades Tunnel Project

In northern New Jersey, the Palisades Tunnel Project is laying the groundwork for a new era of sustainable rail infrastructure beneath the Palisades.

Read More

tcm
Heavy Civil

SAK Tunnel Project

The SAK Tunnel Project establishes a deep-bore stormwater system beneath downtown Austin, designed to capture runoff from the Colorado River. Two six-mile tunnels near US-183 were constructed using specialized tunnel boring machines, with capacity to move more than 100,000 gallons of water per minute.

Read More

State Resources

International Partners

© 2026 FODS. All Rights Reserved.